Nulundanalog.nulund.com← Engineering
Engineering · Manufacturing development · TaiwanFrom 2009

Technical direction for Trek frame production in Taiwan.

My work with Giant began in 2009. Madone 5 Series was the first launch in the engagement. I coordinated with internal and external teams on starting production and worked with the manufacturer’s design and process engineers on composite development and manufacturing.

The relationship continued beyond the initial program. My work combined hands-on engineering, technical training, troubleshooting and production decisions.

Context from a 2014 photo essay inside Giant’s Taiwan frame factory. Not Reggie’s laminate and not the Madone 5 Series program.Photograph · James Huang / Future Publishing · license to confirm
Technical authority

The decisions I carried

AreaMy responsibility on the programs I handled
Composite designMaterial selection, laminate development, ply orientations and final weights.
Development directionSetting priorities with the manufacturer based on the approaches most likely to work.
Test evidenceTest interpretation, failure analysis and final approval of test standards and results.
Manufacturing methodsDeveloping techniques and processes and working with the engineers producing and troubleshooting the designs.
Quality and releaseQuality-control check approval and the technical go/no-go decision for production.
Where the work happened

Written review, development lab and factory floor

Between visits

In writing

I guided the engineering work in writing. The subjects included composite design, test interpretation and the direction of development with the manufacturer.

Context photograph of composite frame development at Giant. Not a record of Reggie’s sessions.Photograph · James Huang / Future Publishing · license to confirm
In the development lab

Beside the engineers

I worked alongside the engineers developing the frames. I trained design engineers to develop laminates and manufacturing/process engineers to produce and troubleshoot them, bringing my own material and laminate-design experience into the work.

Context photograph of frame production at Giant.Photograph · James Huang / Future Publishing · license to confirm
On the factory floor

At the part

I traveled to Taiwan to work through problems with the local team. This took the engineering beyond the design review to the actual part, process and results.

Development priorities

Choose the next direction against the requirements.

I set priorities through discussions with the manufacturer. Material, laminate and process choices had to account for product requirements, final weight and price targets. My experience informed which direction had the strongest chance of working.

Product requirementsFinal weightPrice targets
Production release

Development decisions connected to release.

My involvement included approving test standards and results, quality-control checks and the technical go/no-go decision for production.

Madone 5 Series was the first launch, followed by continued engineering, training and troubleshooting with Giant’s manufacturing organization for Trek products.

Reggie Lund · Composites × Manufacturing

Bring the drawing. Bring the part. Bring the problem.